Feasibility Package · 3–5 days
Home Addition
Add space and value with a seamlessly integrated addition — primary suite, family room, ADU, or garage. Full feasibility analysis with zoning, structural, and permit scope.
Pricing
Choose Your Package
Feasibility tiers emphasize zoning, massing, and new square footage — before you commit to full architectural fees.
Basic
$199one-time
Feasibility Package · Delivered in 3–5 days
Permit scope brief + path-to-stamps roadmap (bundle)
PDF Design Report
3–5 Concept Renderings (1920×1080)
Budget Comparison — Basic · Standard · Luxury
Quick Reference Sheet (print-ready)
Web Portal — lifetime access & sharing
AI transformation video — Premium or Premium+ (not in Basic)
1 revision included · Email support
Pricing revealed at checkout — no commitment until then
Premium
$799one-time
Feasibility Package · Delivered in 3–5 days
60-Second AI Transformation Video
2D Architectural Floor Plan with MEP
6–8 Enhanced Renderings (2560×1440)
Permit-ready scope pack — AHJ / HOA / lender checklist
Interactive Portal — video, floor plan, docs
Itemized Bill of Materials (editable)
Everything in Basic · 3 revisions · 30-day support
Pricing revealed at checkout — no commitment until then
Premium+
$1,499one-time
Feasibility Package · Delivered in 3–5 days
4 Video Formats — 60s · 30s · 15s · 10s
Multi-Layer 3D Floor Plan + CAD files
12–15 Renderings in 4K resolution
Permit package credit — credited toward stamped plans or filing
Enhanced Portal — virtual walkthrough
15-min expert consultation call
Everything in Premium · 3 revisions · 90-day support
Pricing revealed at checkout — no commitment until then
What's Included
Review checks feasibility signals: setbacks, massing, and addition use-case vs zoning assumptions.
Video Overview
From “we need more space” to a feasibility story
Watch how setbacks, massing, and use-case (suite vs ADU) roll into an addition-focused permit brief instead of a generic remodel checklist.
Project Cost & Timeline
Typical Cost
$80K – $400K
Build Timeline
16–28 weeks
Permits Needed
~6
This project typically requires 6 permits. Your package includes a permit scope brief. Need full permit filing? →
How It Works
Pick a feasibility package
Addition work needs zoning and massing clarity — tiers add structural context and documentation depth.
Addition & site intake
Footprint, setbacks, ADU vs primary expansion, utilities, and tie-in to the existing home.
Feasibility + review
Concept massing, permit scope, and MEP tie-ins focus on new square footage — not interior-only assumptions.
Pre-architect confidence
Bring the reviewed package to an architect or design-build team with constraints already organized.
Ready to get your Home Addition?
Your feasibility package — AI-assisted with renders, cost estimate, and permit scope — delivered in 3–5 days.