DMV Permit SpecialistsDC · Maryland · Virginia

DMV permits, filed
by specialists who know every agency.

We know DC DOB, Montgomery DPS, Fairfax LDS, Prince George's DPS, Arlington PZM, Alexandria, and Baltimore inside and out. We file, track, and get you approved — every form, every agency, every comment cycle.

H
K
L
T
4.9/5 from 200+ DMV clients — homeowners, contractors, and developers

500+

Permits filed

5–7

Day turnaround

98%

First-pass approval

7

Jurisdictions

7 Jurisdictions

Every DMV agency. One team.

Each jurisdiction has its own portal, timeline, agency contacts, and comment patterns. Our specialists work each one daily — no learning curve, no surprises.

DC

Washington DC

Dept. of Buildings (DOB)

2–5 months (plan review) typical turnaround

Residential permits: 3–6 weeks over-the-counter. Full plan review: 2–5 months. HPRB review required for historic properties.

Mo

Montgomery County

Dept. of Permitting Services (DPS)

4–8 weeks typical turnaround

Online ePlans submission. Residential addition review: 4–8 weeks. Expedited track available. HOA coordination required in many communities.

PG

Prince George's Co.

Dept. of Permitting Services (DPS)

4–10 weeks typical turnaround

Plan review 4–10 weeks depending on project complexity. Stormwater management review required for impervious surface changes.

FF

Fairfax County

Land Development Services (LDS)

2–4 weeks typical turnaround

One of the fastest jurisdictions in the DMV. Online Permit Portal. Minor residential permits often approved in 2 weeks. Comprehensive zoning ordinance.

AR

Arlington County

Planning & Zoning Management

3–6 weeks typical turnaround

Dense urban environment with strict impervious surface rules. Form-Based Code applies to certain corridors. Historic district review in Maywood, Lyon Park, etc.

AL

Alexandria City

Dept. of Planning & Zoning

3–8 weeks typical turnaround

Strong historic district oversight (Old Town). BAR review required for historic properties. Relatively streamlined for non-historic residential projects.

BA

Baltimore City

Dept. of Housing & Community Dev.

4–12 weeks typical turnaround

Online One-Stop Shop portal. Longer timelines for plan review. Significant backlog for complex projects. Rowhouse and attached-unit experience required.

All Project Types

Every DMV permit we file

Residential, commercial, historic — we handle the full range across all 7 DMV jurisdictions.

Kitchen Remodel

4 permits typical

Cabinetry, island, plumbing & electrical — one coordinated package across any DMV jurisdiction.

Start Permit

Bathroom Remodel

3 permits typical

Plumbing, tile, electrical, and ventilation permits. In-place replacements often OTC.

Start Permit

Home Addition

6 permits typical

Structural, MEP, zoning, setback, and impervious coverage review — full coordination.

Start Permit

ADU / In-Law Suite

5 permits typical

By-right ADU permits: 4–8 weeks in most DMV jurisdictions. Variance projects: 3–6 months.

Start Permit

HVAC / Mechanical

2 permits typical

Heating, cooling, and ventilation permits across all 7 jurisdictions.

Start Permit

Electrical Upgrade

1 permit typical

Panel upgrades, EV chargers, and service upgrades — expedited OTC in most DMV jurisdictions.

Start Permit

Whole House Renovation

8 permits typical

Multi-permit coordination across trades — structural, MEP, and exterior.

Start Permit

Historic Properties

5 permits typical

HPRB and local BAR review, Secretary of Interior standards, preservation compliance.

Start Permit

Commercial / Retail TI

5 permits typical

Tenant improvements, restaurant build-outs, and office renovations in DC, MD, and VA.

Start Permit

Deck & Patio

2 permits typical

Structural and occupancy permits. Decks over 30" from grade require permits in all DMV jurisdictions.

Start Permit

New Construction

12 permits typical

Full permit coordination from foundation to certificate of occupancy in any DMV jurisdiction.

Start Permit

Multi-Family

10 permits typical

Complex multi-unit residential permits across all trades and occupancy classes.

Start Permit

Simple Process

From intake to approval in 3 steps

01

Select your jurisdiction & package

Tell us your jurisdiction (DC, Montgomery, Fairfax, etc.) and project type. We confirm the exact permit path and fee schedule for your address.

02

We prepare your complete package

Drawings, supporting documents, agency-specific forms, and application checklists assembled within 5–7 business days by our DMV specialists.

03

Filed, tracked & approved

We submit to the correct agency (DOB, DPS, LDS, etc.), monitor status in each jurisdiction's portal, and respond to any comment letters until you're approved.

Permit Timelines

Current turnaround by jurisdiction

Updated quarterly based on active submissions

JurisdictionAgencyTypical Timeline
Washington DCDC DOB 3 wks – 5 mo
Montgomery CountyMontgomery DPS 4–8 weeks
Prince George's Co.PG DPS 4–10 weeks
Fairfax CountyFairfax LDS 2–4 weeks
Arlington CountyArlington PZM 3–6 weeks
Alexandria CityAlexandria P&Z 3–8 weeks
Baltimore CityBaltimore DHCD 4–12 weeks

Licensed Professionals

Every application reviewed and certified by licensed permit expediters with 10+ years of DMV experience across all 7 jurisdictions.

5–7 Day Turnaround

Complete applications assembled in 5–7 business days. Rush service available for DC DOB expedited review and Fairfax fast-track.

Agency Coordination

We handle all correspondence, RFI responses, and inspection coordination directly with DC DOB, Montgomery DPS, Fairfax LDS, and every other DMV agency.

Common Questions

DMV permit FAQs

How long does DMV permitting take?

Fairfax residential permits: 2–4 weeks. Montgomery DPS residential: 4–8 weeks. DC DOB over-the-counter: 3–6 weeks. DC DOB full plan review: 2–5 months. We confirm current timelines for your specific project before filing.

What areas do you cover?

Washington DC (DOB), Montgomery County (DPS), Prince George's County (DPS), Fairfax County (LDS), Arlington County (PZM), Alexandria City, and Baltimore City. We have active agency relationships in all 7 jurisdictions.

Does a kitchen remodel require a permit in the DMV?

Cosmetic work (paint, hardware, appliance swap) typically does not. Moving walls, adding circuits, relocating plumbing, or structural changes require permits in every DMV jurisdiction.

Does a deck always need a permit in the DMV?

Decks over approximately 30 inches from grade require a permit in virtually all DMV jurisdictions. Ground-level patios typically do not. We confirm the specific threshold for your county.

Do all DMV jurisdictions allow ADUs?

All DMV jurisdictions allow some form of ADU, but rules vary significantly by county. Eligibility depends on lot size, setbacks, existing impervious coverage, and water/sewer capacity. We run the eligibility check as part of every ADU permit engagement.

How do I know if my property is in a historic district?

Many properties in DC, Annapolis, Alexandria, Frederick, and other DMV communities are in local or national historic districts without the owner's knowledge. We check this at the start of every engagement and route historic projects through HPRB or local BAR as required.

Which DMV jurisdictions offer expedited review?

Fairfax, Montgomery, and DC (for certain project types) have formal expedited review programs. We confirm availability and file for expedited track when timeline is critical.

Ready to get your DMV permit filed?

Most applications submitted within 5–7 business days.

DC DOB · Montgomery DPS · Fairfax LDS · Prince George's DPS · Arlington PZM · Alexandria · Baltimore

Start My Permit

Not in the DMV? View all permit services →